Broken Arrow charges for building permits by the area involved in construction, modification or repair. Residential permits go through the city’s Citizen Self Service Portal. For a foundation repair, ask the company that assesses your house to name the permit its plan needs. Have it put the fee in the written quote.

Cutaway illustration of steel push piers fixed under a concrete footing and reaching a deeper soil layer
Steel piers set under the footing and down to firmer soil.

Permit charges and the $155 late fee

The city enforces the 2024 International Residential Code, with state and city amendments, according to its Inspections page. Inspections for construction repairs are requested through the same portal. The repair company should know which permit category its work falls under. The Manual of Fees has a general “Building (not specified elsewhere)” line for replacement or repair. Have the company confirm whether that line applies before including it in the quote.

As of October 2026, the same manual lists $155.00 for work started without a permit. Settle the permit before you set a start date. Also ask whether the company or you will request each inspection.

A survey rule at the foundation inspection

A Broken Arrow code amendment adds a step some lots will meet. The Chief Building Official may require a survey if the foundation inspection finds the foundation’s ditch edge less than 6 inches from any of these:

  • an easement
  • a street right-of-way
  • a required setback, the minimum distance a building must keep from a lot line

If your repair is near one of these boundaries, ask the company whether this survey rule applies. Show the company your plat, the recorded map of your lot, or an existing survey at the first visit. Ask whether its price allows for a survey if the city asks for one.

Two counties, two soil surveys

Oklahoma’s tax chart lists Broken Arrow under separate city codes for Tulsa and Wagoner counties. The two county surveys give similar overall shares of high or very high shrink-swell soil: 39.3% in Tulsa County and 38.7% in Wagoner County. Shrink-swell soil swells when wet and shrinks as it dries. Those ratings use the most expansive soil layer that starts within 60 inches of the surface. The FAQ gives the shares for the surface layer alone.

Each side has its own large clay units. In Tulsa County, the Okemah-Parsons-Pharoah complex on 0–1% slopes covers 27,205 acres. Its main soil has a maximum representative linear extensibility of 6.6%, a measure of how much the soil swells. In Wagoner County, the largest listed high-rated unit is the Dennis-Radley complex, at 33,399 acres. That is one reason to choose a company that works on both sides of the county line. The surveys include rural land and do not describe disturbed fill under a subdivision, so the company’s look at your own lot is what counts.

Records from the builder and earlier repairs

The ACS 2020–2024 estimate counts 28,121 Broken Arrow housing units built before 2000. In a subdivision, there may be builder plans or a soils report from when the lots were developed. Look for those and for any records of earlier foundation work. Give them to the company before it writes the quote. A structural engineer is worth adding if the damage is extensive or two bids propose very different repairs. The same goes if a lender or buyer asks for a report.

Floodplain addresses

Any development in Broken Arrow’s regulatory floodplain needs a Floodplain Development Permit, not only new buildings. If your address is mapped, ask the company whether its repair counts as development. Ask it to include that permit in the quote before any digging is scheduled.

What to ask for in a Broken Arrow quote

Request an on-site look through the form below. Ask for a written scope that shows:

  • the cause of the movement
  • the pier count and type
  • any drainage work
  • the permit and inspection charges
  • any survey or floodplain permit your lot needs

The table below draws on national cost guides checked in October 2026. Compare it with the totals companies give you for your house. If two companies name different permits, ask each to explain its choice in writing.