Del City’s Permits & Inspections office, in Community Development, takes Residential Building and Miscellaneous Building permit applications online. Start with a repair company assessment to price the work your house needs. Only about 1 in 10 Del City houses was built in 2000 or later. The county hazard plan lists expansive soil as a local hazard. On top of that, 1,354 parcels sit in FEMA’s high-risk flood zone. So clay and water both belong in the assessment that comes before a price.

Cutaway illustration of steel push piers fixed under a concrete footing and reaching a deeper soil layer
Steel piers set under the footing and down to firmer soil.

Permits and the paperwork in Del City

The city offers two general permit applications through its online portal: a Residential Building Permit and a Miscellaneous Building Permit.

That makes the permit a question to settle with the company. Ask it:

  • whether a permit is required and which application applies;
  • to get the fee from Community Development;
  • to show the fee in the written quote.

For storm shelters, Del City requires the permit to be pulled by a city-licensed contractor. Have the company check whether foundation work requires a local license; the state has no foundation repair license.

Flood-zone lots along Crutcho and Cherry Creeks

The 2024 county hazard plan counts 1,354 Del City parcels in FEMA’s high-risk flood zone. It also counts 4 repetitive-loss properties, ones that have flooded and claimed insurance more than once. The flooding comes mainly from Crutcho and Cherry Creeks. For special flood hazard areas, the city’s zoning ordinance sends land-use review to the Flood Plain Manager. That review goes through the Flood Plain Development Permit process.

If your lot is mapped in the flood zone, tell the company at the first visit. It can check with the city whether a repair on your lot needs that review and build the time into the job.

Clay in the Kirkland-Urban land complex

The county plan’s Del City section marks expansive soils as a local hazard. In the USDA county survey, one of the largest highly expansive areas is the Kirkland-Urban land complex. It covers about 9,616 acres where natural soil and built-up land mix. Its main soil has a representative linear extensibility of 17%. Linear extensibility is a measure of how much the soil swells. That 17% is almost twice the 9% line USDA’s handbook uses for the very high class. These are county survey estimates, not a test under any one house.

Water around the house

Clay and drainage go together. The Foundation Performance Association’s 2004 guidance was written for southeast Texas. It says most repair systems only perform if soil moisture around the house stays steady and stormwater drains away from the foundation. The ASCE Geo-Institute’s homeowner guide gives working numbers. The ground should slope away at least 3 inches in 5 feet, and preferably 6 inches in 10 feet. Downspouts should discharge at least 5 feet from the foundation.

Those numbers are easy to check in your own yard before the visit. Ask each company whether its quote includes drainage work. If not, ask whether its repair assumes you will do it. The table below prices a drainage system separately from pier work.

Older houses and what lifting can do

Only 967 of Del City’s 9,697 housing units were built in 2000 or later. The Census count covers rented and vacant units. It does not record whether a house sits on a slab or on piers and beams. So the year built tells you little about the repair. Original plans and any earlier repair reports are worth having ready.

The ASCE Texas Section’s repair guideline, written for Texas engineers, warns that lifting is unlikely to leave a foundation perfectly level. Two companies may promise very different results, or a buyer or insurer may want a report. In either case, an independent structural engineer can weigh in.

A Del City quote worth comparing

Request a Del City repair quote using the form below. Have the company visit the house before pricing the repair. Ask for a written quote that will:

  • name any required permit application;
  • say whether flood-zone review applies;
  • price piers, drainage and fees on separate lines.

The table’s ranges are national ones. So the line items are what let you compare one Del City bid with another.