Noble includes storm shelters on its regular building permit application. Have the installer check the proposed spot and prepare the plans before filing.

Filing at Noble City Hall
The permit starts with a printed application. You bring it to City Hall or send it in by email. The owner can sign it, or an agent working for the owner, such as the installer. The city asks for these with the form:
- a plot plan showing where the shelter sits on the lot
- a sketch of the planned work
- one complete set of plans
- design data, including wind speed and flood hazard
The person who applies also signs that the latest FEMA flood map does not put the site in a floodplain. Noble’s flood zones follow the Canadian River and Dave Blue Creek. If your lot is near either one, look at the map before you settle on a below-ground unit. The state SoonerSafe rebate excludes below-ground rooms on floodplain lots, while above-ground rooms may still qualify.
Noble’s building inspector checks almost every permitted project. A re-inspection is listed at $10, and any after that at $50. Ask the installer to prepare the plans, file the application and put the permit fee on its own line in the quote.
The 2025 outbuilding rule and your yard
Noble’s September 2025 ordinance covers accessory buildings, meaning sheds and other outbuildings. A permanent one has to sit at least 5 feet from the side and rear lot lines. It cannot sit on a public easement without city council approval. Walls taller than 10 feet need wider setbacks. In residential and agricultural A-1 districts, lots of half an acre or less have a 750-square-foot limit for all accessory buildings.
Have the installer settle how this rule applies to your shelter and mark the required distances on the plot plan. If you already have a big shop or barn, ask how the shelter fits with it on your lot. For yard units in general, see the underground storm shelter guide.
Who can do the work
Noble’s city license is separate from state trade licenses; Oklahoma does not license shelter installation itself. As of October 2026, Noble lists a contractor license at $150 new and $75 a year to renew. Licenses expire June 30, and a renewal after July 31 costs the full $150. Ask which Noble license the job needs and whether the installer holds it. Lights or an outlet inside the shelter need a state-licensed electrician.
Ordinance 631, adopted in September 2025, sets quiet hours for building work in residential districts. Work may not disturb the neighbors between 7:00 p.m. and 6:00 a.m. Plan the dig and the delivery for daytime.
Storms around Noble
The county chart puts local planning in context. On May 12, 2023, Noble reported first responders checking tornado damage in the city that evening. The city’s home page links a Smart911 sign-up for local alerts. Use National Weather Service warnings when severe weather approaches.
Matching the shelter to the house
Census estimates for 2020–2024 count 1,211 Noble housing units built in 2000 or later. The age figures include apartments and mobile homes. For an older garage, start by asking about the slab. Ask how the installer will check it and what happens if it needs work. The garage floor shelter guide explains how those units go in. Rules in nearby Moore and Norman differ from Noble’s, so ask for a quote written for a Noble permit.
What to ask for in a Noble quote
Compare the installed rows in the Oklahoma price table with the full job described in each bid. Have the installer price any slab work and dirt removal for your site. The table uses published prices; your written quote should cover the work at your house.
Request a free quote for an on-site look and an itemized price. Use the form below and ask for:
- an on-site look at the garage or the spot in the yard
- the permit filed by the installer, with the plot plan and plans
- an itemized price: permit, delivery, dirt haul-off and any pad or anchoring
In the comment box, say whether the lot is near the Canadian River or Dave Blue Creek.
Local facts
- Noble's building permit application has its own "Storm Shelter" box, so a home shelter goes through the city's regular building permit. Application for Permit to Construct (City of Noble)
- A Noble building permit costs $35 for the first $1,000 of work plus $2 for each additional $1,000, and the fee list adds a $4 state fee to all trades. Permit Fee Schedule (City of Noble)
- To get a permit in Noble, print the Application for a Permit to Construct and bring it to City Hall; the owner or the owner's agent can apply. Community Development (City of Noble)
- Noble's permit application asks for a plot plan showing the building on the lot, a sketch of the planned work and one complete set of plans. Application for Permit to Construct (City of Noble)
- Under Noble's 2025 accessory building rule, a permanent outbuilding must sit at least 5 ft from side and rear lot lines and off public easements; the rule does not name storm shelters. City of Noble Ordinance No. 627 (City of Noble)
- Noble's 100-year flood zones lie mainly along the Canadian River and Dave Blue Creek, and new construction there must be raised above the base flood elevation. Community Development (City of Noble)
- Half of Noble's 3,449 homes were built in 1990 or earlier, and 31% were built before 1980. American Community Survey 5-year estimates 2020-2024, tables B25034 and B25035 (U.S. Census Bureau)
- NOAA's Storm Prediction Center records 110 tornadoes in Cleveland County from 1950 through 2025; 11 of them were rated F3/EF3 or stronger. SPC Severe Weather Database: tornadoes 1950-2025 (NOAA Storm Prediction Center)
- 35 of those tornadoes happened in 2016–2025. SPC Severe Weather Database: tornadoes 1950-2025 (NOAA Storm Prediction Center)
- The deadliest tornado on record that touched Cleveland County was the F5 of May 3, 1999, which killed 36 people along its full path. SPC Severe Weather Database: tornadoes 1950-2025 (NOAA Storm Prediction Center)
Storm shelter prices in Oklahoma
The overall range is $3,000–$15,000.
| Option | Low estimate | High estimate | Notes |
|---|---|---|---|
| Outdoor underground shelter, 6×8 to 7×10 ft, installed | $4,200 | $5,650 | Published 2026 price lists of two Oklahoma installers (Sprague's Backhoe, CM Construction). Digging and installation included; CM Construction does not state the shelter material. |
| Above-ground safe room for 9–16 people, installed | $6,250 | $8,000 | Same two Oklahoma installer price lists. Installation included. |
| Above-ground steel shelter for 4–16 people, unit only | $3,995 | $9,245 | Survive-a-Storm list prices (TwisterPod and Extreme). Installation not included; delivery extra; needs a concrete pad. |
| In-garage underground shelter, installed | $6,000 | $15,000 | National cost guides (HomeGuide, Angi). No Oklahoma installer publishes an installed price for this type. |
| Typical storm shelter project in Oklahoma | $3,000 | $8,000 | Angi's state range, updated September 2026. |
Usually included
- For the Oklahoma installer prices: the shelter, digging and installation (underground) or delivery, setting and anchoring (above-ground)
Often extra
- City permit: $34.50 in Moore, $54.50 in Norman, $88 (indoor) or $132 (outdoor) plus a state fee in Tulsa
- Dirt haul-off and delivery beyond the installer's service area
- A concrete pad for above-ground units, about $5–$10 per square foot (HomeGuide, 2024)
- Anchoring when billed separately, about $200–$350 (HomeGuide, 2024)
Questions to ask a shelter installer
Can you show written proof that this shelter and its door meet ICC 500 and FEMA P-361?
FEMA does not certify products and says a seller's claim of meeting these criteria should be backed by independent testing or engineering. FEMA P-320 (2021)
How will it be anchored, and is my slab strong enough for it?
FEMA notes that many prefabricated safe rooms end up on slabs without enough reinforcement, which undermines the protection they are built for. FEMA P-320 (2021)
Who gets the city permit, and can I see it before work starts?
Oklahoma's Construction Industries Board tells homeowners to see the building permit before letting work begin. Oklahoma CIB, Home Repair Tips
Will you register the shelter with the city, or should I?
FEMA advises registering the exact location of the entrance with local officials right after installation, so rescuers can find it if debris blocks the exit. FEMA P-320 (2021)
For a below-ground unit: is my lot in a flood zone, and how will water be kept out?
ICC 500 does not allow below-ground shelters in mapped flood hazard areas, and FEMA recommends a sump pump inside in-ground units. FEMA P-320 (2021)
If I want the SoonerSafe rebate, should I wait until I am selected?
SoonerSafe does not pay for a shelter installed before you are notified of selection, and the installer has to sign the certificate of installation. SoonerSafe FAQ (Oklahoma Emergency Management)
What is the payment schedule, and how much is due up front?
The FTC advises against paying the full amount up front and against making the final payment before the work is done. FTC, How To Avoid a Home Improvement Scam
Frequently asked questions
How much is a storm shelter permit in Noble?
As of October 2026, Noble lists a building permit cost example: $35 for the first $1,000, then $2 per extra $1,000. It also lists a $4 state fee for all trades. Have the installer confirm the shelter charge and include it in the quote.
How close to the fence can an outdoor shelter go in Noble?
Have the installer confirm the city's placement rules for your shelter before choosing a spot beside the fence. Ask for those distances on the plot plan, including any easement.
Can I apply for a Noble shelter permit myself?
Yes. The application can be signed by the owner or by an agent working for the owner. If you want the installer to apply, include that task in the agreement.
Can I get the SoonerSafe rebate for a shelter in Noble?
Not right now. Oklahoma Emergency Management lists the 2026 SoonerSafe cycle as closed as of October 2026. Cleveland County was not on the 2025 priority list. When a cycle opens, a shelter installed before you are selected does not qualify.
Does a shelter change my property tax?
Up to 100 square feet of a storm shelter added after January 1, 2002 is exempt from Oklahoma property tax. File form OTC 905 with the Cleveland County assessor unless the shelter is already recorded. You must own the property on January 1 and qualify to receive the exemption that year. The filing deadline is March 15. The exemption ends when ownership changes.
Sources
- Application for Permit to Construct (City of Noble)
- Permit Fee Schedule (City of Noble)
- Community Development (City of Noble)
- City of Noble Ordinance No. 627 (City of Noble)
- City of Noble Ordinance No. 631 (City of Noble)
- License for Fiscal Year 2025-26 (City of Noble)
- ALERT: First Responders Assessing Tornado Damage – Power to be Restored As Soon as Possible (City of Noble news, May 12, 2023)
- City Of Noble, Oklahoma (home page)
- SPC tornado database 1950-2025, all tornadoes (NOAA Storm Prediction Center)
- SoonerSafe Safe Room Rebate Program (Oklahoma Emergency Management)
- SoonerSafe Frequently Asked Questions (Oklahoma Emergency Management)
- Oklahoma Constitution – Article X – Revenue and Taxation (Oklahoma State Senate)
- OAC 710:10, Chapter 10. Ad Valorem (Oklahoma Tax Commission, 2026 rules)
- Frequently Asked Questions (Oklahoma Construction Industries Board)
- American Community Survey 5-year estimates 2020-2024, tables B25034 and B25035 (U.S. Census Bureau)
- Oklahoma Below-Ground Storm Shelters (Sprague's Backhoe)
- Oklahoma Above-Ground Storm Shelters (Sprague's Backhoe)
- Storm Shelters (CM Construction)
- Residential Storm Shelters (Survive-a-Storm)
- How Much Does a Storm Shelter Cost? (Angi)
- Tornado & Storm Shelter Costs (HomeGuide)
- SPC Severe Weather Database: tornadoes 1950-2025 (NOAA Storm Prediction Center)